The information on this web page is listed in numerical order by contract number. If there is a bid tabulation available, it can be downloaded by clicking on the "See Bid Tab" link below the contract title. All bid tabulations are in Adobe Acrobat (.pdf) format. If the contract does not lend itself to a bid tabulation, the award information will be displayed below the solicitation title.
CAP will post a PRELIMINARY bid tabulation within 2 business days of the advertised bid opening. The information on the PRELIMINARY bid tabulation will be posted as it was prepared during the bid opening. CAP makes no guarantee as to the accuracy of any information on the PRELIMINARY tabulation. A FINAL bid tabulation will be posted on the website after contact award and will remain on the website for 60 days after the posting date.
Competitive sealed bids and proposals will be recieved by the purchasing office for the following:
| solicitation # | title | buyer | awarded to | documents | date opened | posted date |
| C0996 | Enterprise Financial Planning Software | Art Enriquez | IBM Cognos |
|
03-02-2010 | 03-08-2010 |
| C0963 | Learning Management System | Art Enriquez | Under Evaluation | No Files Listed | 11-24-2009 | 03-08-2010 |
| C0993 | CAP Service Area Hydrologic Evaluation | Rick Lott | JE Fuller Hydrology & Geomorphology, Inc. |
|
02-25-2010 | 04-21-2010 |
| C1015 | Communications Cable Replacement Phase 3 Design Services | Rick Lott | Short List |
|
03-16-2010 | 04-21-2010 |
| C1018 | Curcuit Breaker Overhaul | Tom North | Advanced Electric Service |
|
03-25-2010 | 04-22-2010 |
| C1034 | Ten Feet Cathodic Protection Survey | Tom North | Accurate Corrosion Control, Inc. |
|
04-21-2010 | 04-22-2010 |
| C1029 | Maintenance Organization Assessment | Art Enriquez | CH2M Hill |
|
06-02-2010 | 06-02-2010 |
| C0992 | Pima Mine Road Recharge Improvement Project Engineering Design Services | Rick Lott | Black & Veatch |
|
01-28-2010 | 04-21-2010 |
| C1022 | Right-of-Way Injection Weed Spray System | Tom North | Sprayer Sales, Co |
|
04-15-2010 | 04-21-2010 |
| C1036 | Enterprise Management Assessment | Art Enriquez | Under Evaluation | No Files Listed | 06-09-2010 | 06-09-2010 |
| C1038 | Aquatic Weed Harvesting | Thomas North | DeAnglo Brothers, Inc. |
|
05-12-2010 | 06-01-2010 |
| C1040 | Cooling Tower Replacement | Rick Lott | Mechanical Products SW, Inc. | No Files Listed | 05-12-2010 | 05-18-2010 |